Schedule / Manage Dispatches with DDM

Modified on Tue, 15 Feb 2022 at 09:06 AM

TABLE OF CONTENTS


Tutorial Video






Resources available to schedule shown on Dispatch Calendar

 Resources are listed on the Calendar per Employee Name, not Resource Name.

A Multi-Market Employee is not shown as available if he/she is scheduled in any Market.

Available resources are sorted by Employee Categories, then alphabetically inside the category.





Make informed, collaborative Dispatches from the Calendar

Read about the Dispatch Calendar functionality and features here.


  • Work with the Dispatch Calendar filters to schedule visually.
  • Review Past / Future Schedule in the Dispatch Calendar. 

Scroll through all past / future Dispatches to be informed by trends in scheduling decisions.

  • Resource Pool on the Dispatch Calendar shows available/unavailable people. 

Refer to “Not Available Resources” (like PTOs) and “Available Resources” (resources yet scheduled to any WO) when planning crews/assignments.





Schedule/Publish a Dispatch via the Dispatch Calendar

Schedule a Previously Scheduled WO for Another Day

If you are scheduling a WO which has previously been scheduled, you can easily create additional Dispatches from the old Dispatch’s card.

Click the old Dispatch’s banner on the Dispatch Calendar to open the Dispatch card.







Schedule a New WO on Dispatch Calendar


  • Date (that these Dispatch settings apply to).
  • Crew Container. You can pre-set crews, with a designated main assignee (crew lead) and crew members, for faster selection during dispatch.
  • Crew Lead.
  • Crew Members.
  • Prevailing wage. Very Important! Check this box to make sure that the hours get flagged as PW for payroll.
  • Allow overnight. Important! Check this box to prevent the system from Force-Clocking-Out your crew when they work past midnight.
  • Remote Hotel. Mostly informational, but can be used by special Audits as well.
  • Use GEO Fence to automatically define WO. This parameter is populated from WO Type and not available for editing in the Dispatch Card.
  • ClockIn Before/After & Arrival/Departure Before/After Times: set these times for crew information and to trigger special Audits (if configured at your company).
  • Dispatch Comments. These notes push to the new WO Notification messages and WO Summary screen in the App.




Publish Dispatch Via Calendar Dashboard





Edit Dispatch/populate for Multiple Days

Watch a video on how to: 





Cancel Published / Unpublished Dispatches Differently

You can delete Unpublished Dispatches and cancel  Published ones. Canceled Dispatch = Grey Card on Dispatch Calendar.

Learn more on how to delete/cancel dispatches.





Fix Work Resolution Problems

Ad Hoc Work Order General Information

From time to time you may not be able to completely resolve work according to the standard workflow process set up during BP generation. This happens when, for example, a crew was deployed to a Site to resolve an issue but failed to resolve it.


To fix work resolution problems like this, the BPO can create an Ad Hoc WO.

An Ad Hoc WO can be used, for example, to redeploy a crew to a Site to troubleshoot a recurring problem.


When an Ad Hoc WO is created, a new WO is generated from one of the Work Order Types (WO Types) designed by the Project Library Manager (PLM) for the Project of which the BP is a part. 


The PLM is a user with full access to Work Order Types Reference. So, the PLM determines which WOs are available to add to a BP as Ad Hoc WOs. The PLM can also add optional WOs specifically designed for the situation where an Ad Hoc WO would be needed, like the above example of redeployment to a Site. These optional WOs are not part of normal BP generation and are only added later if the BPO decides they are needed. 

Find more here about WO Types settings.


To add an Ad Hoc WO to an existing BP:

  1. Find and open the BP card.
  2. On the ribbon Home tab, in the FSM group, click Add New WO.
  3. The “Work Order Types – Selection” window displays all WOs for this Project and Scenario, which the PLM allowed to be added as Ad Hoc WOs.
  4. Select a WO Type you would like to add as an Ad Hoc WO to the BP.



"Add New WO" action in the Build Plan Card is available for Build Plan Owners, Project Owners, and Members of BP's Project Roles.


Ad Hoc WOs may need to be scheduled by the BPO.

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select atleast one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article